advertisement
Video Editor: Sandeep Suman
(Are the ‘acche din’ here for villages adopted by PM Modi's star MPs? Watch The Quint’s ground reports from villages adopted under the 'Sansad Adarsh Gram Yojana’ (SAGY))
The first such village that we visited was Rawal in Mathura, Uttar Pradesh, which was adopted by actor-politician Hema Malini under the SAGY scheme in 2014.
Hema Malini, a BJP Member of Parliament, adopted Rawal village in Mathura in Uttar Pradesh under the SAGY scheme in 2014. The village has a population of 3,000 people.
Contrary to what was expected to be achieved under the SAGY scheme when it was first floated, our ground report shows that in four years, Hema Malini has failed to convert Rawal into an adarsh (ideal) village.
The primary objective of SAGY was to have Members of Parliament oversee the development of their adopted village and cater to the needs of the inhabitants based within that particular adopted village. Some of the goals the MPs were to achieve under SAGY are:
The government kickstarted the SAGY project scheme with the goal to develop three Adarsh Grams by March 2019, of which one was supposed to have been developed by 2016.
The Quint spoke to the village head and the residents to understand how their lives had been impacted after being included in the ‘model village scheme’.
The bureaucrats claim that Hema Malini floated 1,100 projects for the development of the village. We checked six such essential projects.
1. Solar lights
After the village was adopted under SAGY, 40 solar lights were installed in the village. However, now all of them are non-functional.
2. Roads
The construction of roads started long ago but has not yet been completed. It is causing more problems than before.
3. Toilets
A few toilets were built in the village, but most of them are now unusable. The village is yet to be open-defecation free.
4. Clean Water Plant
Hema Malini, who also endorses Kent RO, installed an RO water plant in the village. But ironically, the villagers say they rely on water tankers for clean water more than the RO plant.
5. Education
A junior school exists in the village, but it has no power supply because of which the students complain of lack of focus while studying.
A new primary school was built, but that is non-functional either. According to the village head, it is so because the whitewash of the school has been pending for months.
6. Healthcare
A new hospital was built in the village but it remains locked due to the lack of doctors.
(At The Quint, we question everything. Play an active role in shaping our journalism by becoming a member today.)