In Photos: Chenani-Nashri, India’s Longest Road Tunnel in J&K

The Chenani-Nashri tunnel, that spans 9.28 kilometres, will be inaugurated by Prime Minister Modi on Sunday.

The Quint
Photos
Updated:
The Chenani-Nashri tunnel, that spans 9.28 kilometres, will be inaugurated by Prime Minister Modi on Sunday. (Photo: Junaid Syed Hashmi)
i
The Chenani-Nashri tunnel, that spans 9.28 kilometres, will be inaugurated by Prime Minister Modi on Sunday. (Photo: Junaid Syed Hashmi)
null

advertisement

India’s longest road tunnel built on the Jammu and Kashmir highway is all set to be inaugurated by Prime Minister Narendra Modi on Sunday.

The Chenani-Nashri tunnel spans 9.28 kilometres and is expected to cut travel time from Jammu to Srinagar by at least two hours.

Billed as an engineering marvel, the twin-tube tunnel will be operational during winters.

It’s India’s longest road tunnel built on the Jammu and Kashmir highway. (Photo: Junaid Syed Hashmi)

But it’s not only the length that’s being talked about. The state-of-the-art tunnel boasts of an integrated tunnel control system which will control communication, ventilation, video surveillance and an FM signal repeater among other things.

It’s being touted as a state-of-the-art tunnel. (Photo: Junaid Syed Hashmi)

Built on the lower Himalayan range at height of 1,200 metres, the tunnel has been constructed at a cost of Rs 3,720 crore.

It’s built on the lower Himalayan range at height of 1,200 metres. (Photo: Junaid Syed Hashmi)
The Chenani-Nashri tunnel spans 9.28 kilometres.(Photo: Junaid Syed Hashmi)
The tunnel has been constructed at a cost of Rs 3,720 crore. (Photo: Junaid Syed Hashmi)
ADVERTISEMENT
ADVERTISEMENT
Prime Minister Modi will inaugurate the tunnel on 2 April. (Photo: Junaid Syed Hashmi)
The tunnel boasts of an integrated tunnel control system. (Photo: Junaid Syed Hashmi)
According to the NHAI, the Chennai-Nashri tunnel has been completed 10 months later from the scheduled date of completion. (Photo: Junaid Syed Hashmi)
The tunnel spans 9.28 kilometres and is expected to cut travel time from Jammu to Srinagar by at least two hours.(Photo: Junaid Syed Hashmi)
While the construction was started on 23 May, 2011, the tunnel was to be completed on 20 May, 2016. (Photo: Junaid Syed Hashmi)

(With inputs from Junaid Syed Hashmi in Kashmir.)

(At The Quint, we question everything. Play an active role in shaping our journalism by becoming a member today.)

Published: 02 Apr 2017,08:36 AM IST

ADVERTISEMENT
SCROLL FOR NEXT