advertisement
Indian Railways on Friday, 21 August, cancelled the tender for the manufacturing of 44 rakes of Train 18, which has been re-christened as Vande Bharat Express, and said a fresh tender will be floated within a week's time, focusing on Make in India as a Chinese Joint Venture also applied as a foreign bidder.
The Ministry of Railways in a statement said: "Tender for manufacturing of 44 sets of semi high-speed train set (Vande Bharat) has been cancelled." "A fresh tender will be floated within a week as per revised public procurement (Preference to Make in India) order," it added.
The Chennai-based ICF has invited bids for procurement of electric traction kits for Train 18, the country's first self-propelled train without locomotives.
Train 18 was manufactured by ICF, which is owned by the Indian Railways, with over 80 per cent indigenous materials and was rolled out in October 2018 amidst much fanfare.
The train was later re-christened as Vande Bharat express and was introduced between New Delhi and Varanasi, Prime Minister Narendra Modi's parliamentary constituency, in February last year. In October last year, the second Vande Bharat Express train was introduced between New Delhi and Katra.
In December last year, Indian Railways had planned to complete the production of 44 more new rakes on India's 75th Independence day. All the coaches of Vande Bharat Express have a stainless steel car body equipped with automatic doors with sliding footsteps, on-board computers for train control and remote monitoring. The coaches also have a GPS-based audio-visual passenger information system, on-board hotspot WiFi and comfortable seating arrangements.
(At The Quint, we question everything. Play an active role in shaping our journalism by becoming a member today.)