advertisement
Lucknow’s first metro rail, which promises to be “cheap” and “eco-friendly”, will open its doors to the public on Wednesday. Nearly nine months after its trial run, the metro is all set to open its 8.5 km “priority corridor” to the public.
The corridor, which extends from Charbagh station to Transport Nagar, was jointly inaugurated by Home Minister Rajnath Singh and Uttar Pradesh Chief Minister Yogi Adityanath on Tuesday. Its claim to fame is that it is allegedly India’s fastest ever metro, and has been certified as a “green metro”.
As Lucknow folks get ready to hop on board their first metro ride in their city, here is a quick look at the ticket prices.
From Charbagh to Transport Nagar, the total number of stations the “priority corridor”covers is eight. At present, these are the only stations the metro will be passing through.
While Akhilesh Yadav laid the foundation stone for Phase 1A of the Lucknow Metro Rail project on 4 March 2014, work for the same began on 27 September, the same year.
The metro has been designed in a way that almost everyone can use it, even those with special needs.
The metro rail system is said to have the “most advanced signalling and train control system”, as per a report in The Indian Express. The system, known as Communication Based Train Control System, will equip trains to practically function on “driverless” mode.
(With inputs from The Indian Express, HT, The Hindu)
(#TalkingStalking: Have you ever been stalked? Share your experience with The Quint and inspire others to shatter the silence surrounding stalking. Send your stories to editor@thequint.com or WhatsApp @ +919999008335)
(At The Quint, we question everything. Play an active role in shaping our journalism by becoming a member today.)